In December 2025 investigatory works were undertaken to establish the condition of the reinforced concrete, concentrating mainly around half-joints and movement joints in the bridge deck. The results of these investigations have been incorporated in a set of construction drawings and a repair specification. This information will form the basis of a Stage 2 contract to implement repairs and replacement of movement joints.
Frist
01.06.2026
Veröffentlicht
14.10.2026
Zuschlag erteilt
14.10.2026
D-TRO Project 2026 Support Services
Zuschlag erteilt·Oct 28
CareCubed Social Care Costing Software
Zuschlag erteilt·Oct 27
Heron Hill - Window & Door Replacement
Zuschlag erteilt·Oct 20
Legal Services Contract for the Heart of Barrow
Zuschlag erteilt·Oct 20
CWF Lot 2A - Moss Side Cattle Grid Replacement
Zuschlag erteilt·Oct 9
CWF Lot 2A - Town End (Orton) Bridge
Zuschlag erteilt·Oct 6
Nether Bridge Parapet Repairs
Zuschlag erteilt·Oct 6
Keswick to Threlkeld Bridge Deck Replacement Design and Installation
Zuschlag erteilt·Aug 3
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Zuschlag erteilt·Oct 31
March 2027 Bus Contracts
Zuschlag erteilt·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Zuschlag erteilt·Oct 30
Provision of Pre-Paid Cards
Zuschlag erteilt·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Zuschlag erteilt·Oct 30
Business Travel Services
Zuschlag erteilt·Oct 30
Erstellen Sie ein Konto, um diese Ausschreibung zu prüfen und ähnliche Möglichkeiten zu finden.