This project primarily involves the design and reconstruction of Bellow Hill Culvert on the A684 near Garsdale. The works also include additional carriageway and drainage works at two nearby locations within an approximate 320m distance of the main site.
Frist
10.07.2026
Veröffentlicht
16.09.2026
Zuschlag erteilt
16.09.2026
CWF Lot 2A - Reconstruction of Old Row, Stainton Retaining Wall
Lot 2B- Structural Assessments 2025-26
A66 Northern Trans Pennine Project Professional Consultancy Services
CWF Lot 2B South Walney Landfill Erosion Resistance Works
CWF Lot 2A - Cockley Beck Cattle Grid Replacement
Cumbria Highway Assignment Model & Travel Demand Estimate
CWF Lot 2a - Reconstruction of Newbiggin Manor Farm Culvert
EKFB JV - Ancillary Culverts Works package NC2A
A66 - Scheme 3A - Penrith to Temple Sowerby - Culvert Installation
CA18156 - Tender 42/2026 - Integrated Consultancy Team for Extension to Struell Cemetery, Downpatrick
Collections, Caseload Manager, and Paypoint Integration
Corporate Travel Agency Lot 2- Replacement
Contingent Labour - Non Clinical Temporary Staff
CA17925 - Tender 08/2026 - Appointment of ICT for Greenway Route Downpatrick to Ardglass - (Mini Competition off BCC Regeneration Framework - Lot 1)
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
© 2026 SIA «Vietne». Alle Rechte vorbehalten.