Construction of 258m3 attenuation basin as per designs Construction of new manhole off Yorkshire Water sewer with weir allowing water into basin as per design Construction of Headwall as per design Removal of Waste material as required.
Frist
02.10.2025
Veröffentlicht
19.06.2026
Zuschlag erteilt
19.06.2026
TD2426 - Derby Road Chellaston Drainage Lining
A66 - Scheme 3A - Penrith to Temple Sowerby - Drainage
Procurement of office and IT equipment
T0345 - Dry Dock & Repair of Lightvessel 06
T0345 - Dry Dock & Repair of Lightfloat 03
T0345 - Dry Dock & Repair of Lightvessel 07
Provision of External Legal Panel Support for Patrick Finucane Inquiry
Face to Face Translation Services Contract
© 2026 SIA «Vietne». Alle Rechte vorbehalten.