Currently there are two chillers at the Oncology building. The old R22 refrigerant chiller 2 needs to be replaced with a heat exchanger and pipes to the new chilled water system in the adjacent Parkside building ETP003. The works include construction of a new chilled water system from oncology to Parkside building. Associated works i.e. seismic engineering (NZS 4219), scaffolding, penetrations, lifting out the old R22 chiller through the roof.
Veröffentlicht
15.09.2026
Offen für Angebote
15.09.2026
Frist
16.10.2026
Southland Hospital MSB5 Ring Main Unit Replacement
Community Based Maternal Mental Health, Peer-led Support for Substance Related Harms
Request For Proposal of Supplier Capability Panel for high-throughput Laboratory Biochemistry Testing (HbA1c) Analysers, Consumables and Maintenance Services
RFP for the Appointment of Suppliers to the Panel for the Supply of Molecular Diagnostics and Testing Technologies, Consumables and Associated Services
Kaiawhina Workforce RFP
After Hours and Urgent Care Services for Timaru
Fleet Maintenance and Repair - Central Lakes
Morrinsville School - Blocks A, C, D, FA (Board), H, J, L, N - Roofing Works
Non-Teaching Staff PLD Panel - Neurodiversity
RFT - Whakatane High School - 5YA Blocks B, G and H Remediation Works
Main Building Contractor for Stage 2 of the Learning Support Fencing project at Waiopehu College
Registration of Interest - Main Contractor for Block 19 (Full) & Block 24, 25 (Partial) Cladding Replacement at St Albans School
© 2026 SIA «Vietne». Alle Rechte vorbehalten.