Otnox
🇩🇰Dänemark·Auftraggeber: Lokaltog A/S

Charging Infrastructure at Hårlev Station

Zuschlag erteilt·7 Aug. 2026·EUR 14,700,000

The Contractor undertakes to design and perform a full charging infrastructure system com-patible with the battery-powered rolling stock described in Contract appendix 1, Requirements Specification. The Contract includes a complete power supply infrastructure and overhead contact line sys-tem, to be able to perform dynamic and static charging for battery trains: Hårlev Station • Overhead contact line system covering the three main tracks at the station • 50/25KV transformer solution to ensure power to the overhead contact line system • Detailed design • 400V power to train maintenance systems and heating and cleaning • Safety and interoperability approval • All necessary cable works on the station including cable trays • Immunization of the station signaling systems • Low voltage: Replacement of existing electrical panels with Class II panels • Earthing & bonding the station and staging area, and creating new cable routes • Test and Commissioning including handover to operation • SCADA system • Maintenance and operation of the SCADA system

Veröffentlicht

07.08.2026

Zuschlag erteilt

07.08.2026

Otnox

Finden Sie Ausschreibungen, bei denen sich die Teilnahme lohnt.

Erstellen Sie ein Konto, um diese Ausschreibung zu prüfen und ähnliche Möglichkeiten zu finden.

  • VergabeunterlagenPrüfen Sie verfügbare Dateien in einem Arbeitsbereich.
  • Anforderungen und RisikenBeauftragen Sie eine Dokumentenanalyse mit Quellenverweisen.
  • Ihre AusschreibungsauswahlFahren Sie mit Ihren gewählten Märkten und Branchen fort.