Noise barrier consumables include all small components required for the installation and fixing of the noise barrier system along the project alignment. These items typically include bolts, nuts, washers, nord locks, joint materials such as EPDM strips used during installation. Their purpose is to ensure the correct assembly, alignment, and secure fixing of the precast acoustic panels and associated elements to the supporting structure. These consumables are essential to achieve the required structural stability, durability, and acoustic performance of the noise barrier system.
Veröffentlicht
13.03.2026
Aktīvs
13.03.2026
Frist
20.03.2026
BBV HS2 MWCC NORTH Flooring, screed, & tiling
Geschlossen·Oct 9
BBV HS2 MWCC NORTH - Fire Engineer Services
Geschlossen·Oct 8
BBV HS2 MWCC NORTH - Soil Scientists Secondments
Geschlossen·Mar 24
BBV HS2 MWCC NORTH - Soil Scientists Secondments
Geschlossen·Mar 24
BBV HS2 MWC North Rayleigh Waves
Geschlossen·Mar 13
BBV HS2 MWCC NORTH - Video conferencing Replacement plan
Geschlossen·Mar 13
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Zuschlag erteilt·Oct 31
March 2027 Bus Contracts
Zuschlag erteilt·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Zuschlag erteilt·Oct 30
Provision of Pre-Paid Cards
Zuschlag erteilt·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Zuschlag erteilt·Oct 30
Business Travel Services
Zuschlag erteilt·Oct 30
Erstellen Sie ein Konto, um diese Ausschreibung zu prüfen und ähnliche Möglichkeiten zu finden.