Otnox
UKVereinigtes Königreich·Auftraggeber: MINING REMEDIATION AUTHORITY

Battery Energy Storage Systems (BESS)

Zuschlag erteilt·18 März 2026·GBP 296,929

The Mining Remediation Authority (MRA) is seeking a contractor to provide battery energy storage solutions for two of our Mine Water Treatment Schemes (MWTS) where solar PV systems are already installed. For each site, the costs for the following items was requested: • Battery Energy Storage System(s) (BESS) • Battery Energy Management System (BEMS) • Replacement of existing solar PV inverters where required to ensure compatibility with the retrofitted BESS. Additional information: We have completed a compliant procurement by mini competition through the Crown Commercial Services Demand Management and Renewal Framework (RM6314). CCS DMR Framework - Lot 2.1 - Procurement of Battery Energy Storage CCS DMR Framework Ref: DMR-45213-2025

Frist

26.01.2026

Veröffentlicht

18.03.2026

Zuschlag erteilt

18.03.2026

Otnox

Finden Sie Ausschreibungen, bei denen sich die Teilnahme lohnt.

Erstellen Sie ein Konto, um diese Ausschreibung zu prüfen und ähnliche Möglichkeiten zu finden.

  • VergabeunterlagenPrüfen Sie verfügbare Dateien in einem Arbeitsbereich.
  • Anforderungen und RisikenBeauftragen Sie eine Dokumentenanalyse mit Quellenverweisen.
  • Ihre AusschreibungsauswahlFahren Sie mit Ihren gewählten Märkten und Branchen fort.