The BSI is seeking a supplier to deliver a Battery Energy Storage System (BESS) solution, including supply, installation, commissioning, and integration with the new Main Switchboard and related site electrical infrastructure. The system must support site electrification, improve energy resilience, optimise energy usage, maintain continuity of supply during outages, and enable integration with the new Main Switchboard and future infrastructure.
Veröffentlicht
21.06.2026
Offen für Angebote
21.06.2026
Frist
24.07.2026
ROI Non SF6 Circuit Breakers
DB2 Main Switchboard Upgrade (MSB)
Electricity Flexibility Solutions - Upper Clutha Area
RFP - Northland Trades Services Panel for Locksmith Projects and Maintenance Services
Vehicle Signage
RFT - Main Contractor for Gym Alterations at Murchison Area School, Murchison, Tasman
Main Contractor for Block A Hall High Level Roof Replacement at James Hargest College
Taihape Raw Water Falling Main Replacement Stage 6 Pt A – Railway
Main Contractor for 4: Toilet Refurbishment at Bayview School
© 2026 SIA «Vietne». Alle Rechte vorbehalten.