The Principal (Hurunui District Council) is looking for a suitably qualified Contractor to undertake the replacement of the existing A32 River Road bridge with a new 36.5m long 3‑span steel concrete composite structure constructed on the same alignment as the existing structure
Veröffentlicht
27.10.2026
Offen für Angebote
27.10.2026
Bedingungen aktualisiert
27.10.2026
Frist
02.12.2026
Amberley Footpath Renewals
Offen für Angebote·Oct 19
Waipara & Amberley Footpath Renewals
Zuschlag erteilt·Apr 17
HDC23-012 Loburn Watermain
Zuschlag erteilt·Feb 25
HDC 24-035 Hawarden Watermain
Zuschlag erteilt·Feb 25
HDC 24-036 SH7A Flax Stream Culvert Upgrade
Zuschlag erteilt·Feb 25
HDC 25-015 Cheviot Wastewater Renewal
Zuschlag erteilt·Dec 18
Yarrow/Isabella & Tramway/Elles Traffic Signals
Offen für Angebote·Oct 15
Road Maintenance Contract
Offen für Angebote·Oct 14
HDC1604_001 Waihi Main Street Flagpoles
Geschlossen·Oct 6
Contract 1117: Kakanui River Road Pavement Rehabilitation
Geschlossen·Sep 29
RFT 26-042 Blomfield Street Pavement Rehab
Geschlossen·Sep 23
ODC Contract 286: Ōpōtiki Netball Court Upgrade 2026
Geschlossen·Aug 3
Long Range One Way Effector
Offen für Angebote·Nov 5
Craig Road Slip Repair (Whangarei Heads Road RP17940)
Offen für Angebote·Nov 5
Seatoun Tunnel Repainting
Offen für Angebote·Nov 4
130-140 Grafton Rd Retaining Wall Construction
Offen für Angebote·Nov 4
Main Contractor for the Blocks 2, 3, 4, 8: Replace Failed Door Ranch Sliders and Window Winders at Oteha Valley School
Offen für Angebote·Nov 4
Main Contractor for the Blocks 1, 4, 5, 6, 8: Roofing and Ceiling Tile Works at Oteha Valley School
Offen für Angebote·Nov 4
Erstellen Sie ein Konto, um diese Ausschreibung zu prüfen und ähnliche Möglichkeiten zu finden.