The gas-boiler (from circa 1990’s) servicing the Rotorua Library Ground Floor (987m2) and Level-1 (712m2) with heating, requires replacement due to reaching its technical end-of-life. Rotorua Lakes Council has chosen to replace the gas-boiler with a HVAC unit.
This contract is for the decommissioning of the existing Air Handling Unit (AHU)-gas boiler and the installation of a new HVAC unit along with various fabrication and construction, new pipework and electrical work within and on top of the Boiler Room.
The proposed new AHU & Heat Pump Chiller installation is required to meet heat load requirements and maintain existing functionality of the ground floor and first floor public spaces of the Rotorua Library / Te Aka Mauri.
Indicative Timeline: October to December 2026: Demolition of existing heating unit November to January 2027: “Roof Strengthening” of the Boiler Room, if required for your system. November to March 2027: Cables/pipes/ducting etc. upgrades February 2027: Installation of the HVAC Unit March 2027: Commissioning 31st March 2027: Project completion deadline
Please go to Tenderlink for further information about this tender. www.tenderlink.com/rdc/
Laden...
Laden...
Laden...
Unterlagen, Auftraggeberkontakte und KI-Analyse an einem Ort. Prüfen Sie Anforderungen, erkennen Sie Risiken und vergleichen Sie Ihre Möglichkeiten.
Möchten Sie nur diesem Unternehmen oder dieser Kategorie folgen? Kostenloses Konto — Suche, Benachrichtigungen, keine Kreditkarte.
Erstellen Sie ein Konto, um diese Ausschreibung zu prüfen und ähnliche Möglichkeiten zu finden.