Expression of Interest Tunnel Vent, Fans and Fan Drives MEP Subcontractor Tunnel Vent, Fans and Fan Drives (Survey and RIBA 4) Scope The objective of this scope is to replace components that form part of the ventilation system at Central Terminal Area (CTA) North and South, Terminal 4 North and South and Sipson Farm, that are at their end of life. The components of concern are Fan Drives and Low Voltage Air Circuit Breakers. It is proposed that all components for the 8 No. existing Variable Speed Drives (VSD) which are close to their designed lifetime are to be replaced, together with the panel. It is proposed that all components for the 5 No. existing Direct On-Line (DOL) starters which are close to their designed lifetime are to be replaced, together with the panel are replaced with VSD's. The VSDs are to be connected to the Tunnel Control System (TCS). The incoming air circuit breakers (ACB's) and the low voltage protection devices (MCCB/MCB's) within the existing switch gear will be replaced with new devices. Where the impact is significant, this may lead to replacing the entire LV switchgear and the DOL panels for the associated equipment. New lighting will be provided by energy-efficient LED luminaires, as the existing lighting system is in poor condition. As part of small power provision, 240V socket outlet assemblies shall be provided near damper units. The existing junction boxes and cable termination boxes need to be replaced with new equipment. Item Question Q1 What capability do you have of understanding the requirements for replacing Electrical infrastructure etc., Specifically considering the constraints of an operational rail network? Q2 What capability do you have of carrying out a survey of the 5 ventilation buildings non-operational hours to provide all the information required to complete the RIBA 4 design? Note: - RIBA 5 onwards including construction is excluded.
Zveřejněno
02.06.2026
Aktīvs
02.06.2026
Termín
09.06.2026
WP6235 -T5D MEP Subcontractor
Uzavřeno·Jun 2
WP1140 - T5D Design Consultant
Uzavřeno·Jun 2
WP1150 - Survey & Design - Tunnel Vent Vans & Fan Drives
Uzavřeno·Jun 2
WP6235 -T5D MEP Subcontractor
Uzavřeno·Jun 2
WP1140 - T5D Design Consultant
Uzavřeno·Jun 2
WP2140 - TR19 MEP Surveys
Uzavřeno·May 7
Arts and Sports Bridge - Pre-Construction Professional Services
Přiděleno·Sep 23
HVAC design and Support services 2026
Přiděleno·Jul 31
Project Callisto
Uzavřeno·Jul 6
Members' Tea Room Refurbishment Project - MDS4001
Přiděleno·Jun 25
Cbip-Ws2-Risk Reduction-Mds-Riba2-Fwk1146-Mds4003
Přiděleno·Jun 25
Mds for Underground Car Park and Critical Services Works
Přiděleno·Jun 25
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.