Loading Otnox...
Otnox
NZNový Zéland·Nákupčí: Westland District Council

WCWT New Totara River Bridge RFP

Přiděleno·27 Nov 2025

A.1.2 Invitation to Submit Proposal On behalf of the Principal, we are inviting proposals to design and construct the works of the above-named Contract. The Contract Works include design and construction of a new Totara River Suspension Bridge for use by cyclists and pedestrians, and a light maintenance vehicle, and are described in more detail below. Proposals for the Contract must be prepared and submitted in accordance with the conditions of proposals in A.2. A valid proposal requires the submission of the items in the checklist in B.1 signed where indicated by an authorised representative of the proposer.

Termín

17.10.2025

Zveřejněno

27.11.2025

Přiděleno

27.11.2025

Otnox

Najděte zakázky, do kterých se vyplatí zapojit.

Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.

  • Zadávací dokumentaceProhlížejte dostupné soubory v jednom pracovním prostoru.
  • Požadavky a rizikaObjednejte si analýzu dokumentů s odkazy na zdroje.
  • Váš výběr zakázekPokračujte s vybranými trhy a obory.