Water Supply PS1060 Scarborough 1 - Rockfall Mitigation

Přiděleno·21 Apr 2026

The present location of the Scarborough 1 Pump Station (PS1060) is exposed to Rockfall (boulder roll) hazard. Although the building was not damaged by rockfall during the Canterbury Earthquake Sequence (CES), one boulder came to rest against the back wall, and several other nearby boulders rolled far enough that they would have impacted the building if their trajectory had been in line with it. The CCC Technical Services team completed a Rockfall Hazard Assessment to establish the likely medium-to-long-term risk to the existing pump station due to rockfall, and to consider what remediation methods may be suitable to mitigate the risk.

Termín

20.03.2026

Zveřejněno

21.04.2026

Přiděleno

21.04.2026

Otnox

Najděte zakázky, do kterých se vyplatí zapojit.

Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.

  • Zadávací dokumentaceProhlížejte dostupné soubory v jednom pracovním prostoru.
  • Požadavky a rizikaObjednejte si analýzu dokumentů s odkazy na zdroje.
  • Váš výběr zakázekPokračujte s vybranými trhy a obory.