To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate various compounds (including railheads) along the route, to meet the construction logistics requirements of FBRS and also support the requirements of other Railway System Contractors from the Alliance. These compounds will require temporary works that will not form part of the final permanent works. The number and location of the compounds to be used are still to be confirmed at this stage: The Consultant shall achieve integration and coordination between temporary and permanent works design, liaising with the Permanent Works Designer where required. Examples of the scope of this required design works are as follows (but not limited to) within compounds and railheads- •Temporary site buildings and offices •Temporary utilities & services •Temporary roadways and hardstandings •Temporary site drainage systems •Fencing •Lighting & Security systems Note: the scope does not include any design of Track layouts and geometry, Track, Track drainage, LWR and S&C hardstanding areas, associated gantry foundations within the railheads. Potential mobilization start (soft start) in October 2026 - then estimated full start February 2027.
Zveřejněno
01.05.2026
Otevřeno k podání nabídek
01.05.2026
Termín
15.05.2026
Specialist Rail Systems Personnel
Otevřeno k podání nabídek·Oct 28
Transport of slabs
Otevřeno k podání nabídek·Oct 21
LWR Trailer Solution
Uzavřeno·Aug 18
Temporary Works Designer (Track Design Railhead)
Uzavřeno·May 1
Temporary Works Designer - Framework
Uzavřeno·May 1
Temporary Works Designer (Track Design Railhead)
Uzavřeno·May 1
Specialist Rail Systems Personnel
Otevřeno k podání nabídek·Oct 28
NE - CDF - Lot 1 - River Hipper FAS SOC to OBC Appraisal
Přiděleno·Oct 27
EAN - AOMR - Lot 1 - Snettisham Hard Defence Repairs
Přiděleno·Oct 27
Contract Award Notice - Tree Inspections & Tree Works for Upper Thames 26-27 - Lot 3
Přiděleno·Oct 26
Temporary Agency Staff for Drainage Engineer
Přiděleno·Oct 20
Technical Approval Authority - Advisor
Přiděleno·Sep 29
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.