Canterbury Regional Council (Environment Canterbury) (the Council) (the Principal) has a statutory function under the Soil Conservation and Rivers Control Act 1941 to manage land use within the region to prevent and mitigate damage caused by floods and erosion (see s126 of the Act). In the 2021 Ashburton Floods, a breakout flood at this location caused extensive damage and risk to life. A ~4 km stretch of the river around Shearers and Walkhams Road, where this breakout occurred, has been identified as an ongoing major flood risk. This reach is significantly narrower than the general stopbank-to-stopbank width in the North Branch of the Ashburton River (NBAR), increasing the likelihood of a breakout. Severe aggradation through this reach has also caused the river to be perched well above the surrounding land, decreasing the capacity of the river and increasing the out-of-river flow risk. Modelling conducted of the whole NBAR identified an opportunity to address some of this risk, through relocation of the stopbank and widening of the river. The Council is proposing to construct a new stopbank starting in November/December 2026 located at about 1 km downstream of Shearers Road. The Council wishes to engage a suitably experienced contractor who will work collaboratively with the Council and its professional advisors to deliver an outcome which fully meets all time, stakeholder requirements, cost and quality objectives. This contract involves the extraction of approximately 35,000 to 40,000 cubic metres of gravel from the reach, construction of approximately 770 metres of stopbank and deconstruction of the existing stopbank. The first phase is the construction of the new stopbank which involves site preparation, gravel extraction to supply stopbank construction material, stripping/stockpiling of topsoil, and placement/compaction of the gravels to form a stopbank. The second phase is the deconstruction of the existing stopbank and placement of this material to form groyne bunds to protect the new stopbank. The gravel will be extracted from the river under the Council’s resource consent to undertake works in the river, and the Council’s gravel authorisation.
Zveřejněno
06.10.2026
Otevřeno k podání nabídek
06.10.2026
Termín
28.10.2026
RIV_2600737 Waitarakao Seadown Stopbank and Drainage Channel
Otevřeno k podání nabídek·Oct 30
Total Mobility and wider PT Assurance
Otevřeno k podání nabídek·Oct 30
2600800 Renewable Energy Development
Otevřeno k podání nabídek·Oct 18
RIV_2600611 Rangitata/Rakitata River Flood Resilience – Groyne Rockwork Reinstatement
Otevřeno k podání nabídek·Oct 18
Laboratory Services
Uzavřeno·Sep 27
Blue-Green Network Plan & Supporting Implementation Guidance
Uzavřeno·Sep 18
Regulatory Support Services Panel
Otevřeno k podání nabídek·Oct 8
2026-11193 - Mechanical Drain Cleaning (Three Packages)
Otevřeno k podání nabídek·Oct 4
BNB_2600566 Rakaia Gorge Biodiversity Protection
Uzavřeno·Sep 1
Moehau Predator Control
Uzavřeno·Aug 14
Veterinarian Services and Related Products
Uzavřeno·Aug 2
Haast Kiwi Sanctuary Trapping
Uzavřeno·Jul 17
PNCC - Waste Water Treatment Plant Seismic Strengthening
Otevřeno k podání nabídek·Oct 30
Grow Manukau Health Park - Electronic Wayfinding and Pathfinding Solution
Otevřeno k podání nabídek·Oct 30
Total Mobility and wider PT Assurance
Otevřeno k podání nabídek·Oct 30
New Care Response for Taranaki Manawatū
Otevřeno k podání nabídek·Oct 30
National Parking Equipment Replacement Programme
Otevřeno k podání nabídek·Oct 30
Contract 26_08 Hastings Road Pavement Rehabilitation
Otevřeno k podání nabídek·Oct 30
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.