Hutt City Council is continuing its programme of investment in natural-turf sportsgrounds to improve drainage performance, turf condition, resilience to wet weather and the number of playable hours available to the community. For the 2026/27 programme, HCC intends to undertake sportsground subsoil drainage and associated improvement works at HW Shortt Park and Memorial Park. The works include installation of lateral and collector subsoil drainage, drainage-disposal infrastructure, targeted grading, turf reinstatement and associated works. At HW Shortt Park, the works include on-site soakage infrastructure because conventional stormwater infrastructure is not available to receive the proposed subsoil drainage flows. The separately renewed cricket block will be completed before the drainage works commence, with this contract including the grading required to blend the surrounding field into the completed cricket-block levels. At Memorial Park, the majority of the proposed drainage system will discharge towards available stormwater infrastructure. A portion of the field cannot discharge by gravity and will require storage and pumped discharge to the stormwater system.
Zveřejněno
25.08.2026
Otevřeno k podání nabídek
25.08.2026
Termín
23.09.2026
ROI - Daly Street Redevelopment
Otevřeno k podání nabídek·Oct 28
ROI - Future Waste Pathways
Otevřeno k podání nabídek·Oct 27
Advance Notice - Future Waste Pathways
Uzavřeno·Oct 22
Advance Notice - Daly Street Redevelopment
Uzavřeno·Oct 6
ROI - Residential Development – Lead Consultant Team
Uzavřeno·Sep 14
AN - Residential Development Lead Consultant Consortium
Uzavřeno·Sep 2
Wastewater Network Pipe Rehabilitation 2627
Otevřeno k podání nabídek·Oct 23
6 Paekākāriki Hill Road culvert renewal - construction
Otevřeno k podání nabídek·Oct 19
RFT - Paora Street Drainage Improvements
Otevřeno k podání nabídek·Oct 2
Contract 25/106 Woodend Water Renewals, Stormwater and Footpath Upgrade 2026/27
Uzavřeno·Sep 9
King Edward Street, Eltham Construction of Open Drain
Uzavřeno·Aug 10
#34 Paekakariki Hill Road Culverts Physical Works
Přiděleno·May 14
PNCC - Waste Water Treatment Plant Seismic Strengthening
Otevřeno k podání nabídek·Oct 30
Grow Manukau Health Park - Electronic Wayfinding and Pathfinding Solution
Otevřeno k podání nabídek·Oct 30
New Care Response for Taranaki Manawatū
Otevřeno k podání nabídek·Oct 30
Total Mobility and wider PT Assurance
Otevřeno k podání nabídek·Oct 30
National Parking Equipment Replacement Programme
Otevřeno k podání nabídek·Oct 30
Contract 26_08 Hastings Road Pavement Rehabilitation
Otevřeno k podání nabídek·Oct 30
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.