TDC is seeking a qualified and experienced Three Waters contractor who is ready to try their hand at something a bit different – not just construction, but design too. Raw water for treatment at the Temuka Water Treatment Plant is sourced from six bores - three located on the treatment plant site and three located approximately 400-500 metres away near the intersection of Orari Station and Coach Roads. Of the off-site bores, only one is currently in service, and raw water is conveyed to the treatment plant via a single 150mm diameter pipeline. The two other off-site bores are new. Additional raw water conveyance capacity is required to enable supply from the two new off-site bores and to meet increasing demand. There is also a requirement to introduce redundancy into this part of the system. To achieve this, TDC requires the construction of a second raw water pipeline. We want to trial giving you the parameters, and you provide us with the full package – design through construction, testing and completion of the installed pipeline.
Zveřejněno
08.09.2026
Otevřeno k podání nabídek
08.09.2026
Termín
05.10.2026
RFP 2826 South Timaru Hydraulic Model Build and System Performance
Otevřeno k podání nabídek·Oct 15
RFP2828 - Timaru CBD Tile Replacement Programme Investment and Delivery Plan
Uzavřeno·Sep 22
2813 - Stafford Street and Barnard Street Water Services Renewal
Uzavřeno·Sep 6
RFT2797 - Kellands Hill/Rosewill Valley/Cartwrights Roads “SH1 Resilience Route” Project
Uzavřeno·Aug 19
RFT2647- Landsborough Road Bridge
Uzavřeno·Aug 14
RFP2702 - Talbot Street Sewer Main Upgrade
Uzavřeno·Jul 8
Ohourere Water Treatment Plant - Electrical and Process Upgrade
Otevřeno k podání nabídek·Oct 29
Lake Terrace Water Treatment Plant Seismic Strengthening
Otevřeno k podání nabídek·Oct 25
Water and Wastewater Assets Valuation
Otevřeno k podání nabídek·Oct 23
PNCC - 26_047 - Milson Line Water Reservoir Design and Build
Otevřeno k podání nabídek·Oct 18
Water Mains Resilience Phase Three
Otevřeno k podání nabídek·Oct 18
RIV_2600611 Rangitata/Rakitata River Flood Resilience – Groyne Rockwork Reinstatement
Otevřeno k podání nabídek·Oct 18
PNCC - Waste Water Treatment Plant Seismic Strengthening
Otevřeno k podání nabídek·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Otevřeno k podání nabídek·Oct 29
Herschell Street Carpark Redevelopment
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Otevřeno k podání nabídek·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.