Langbaurgh Closed Landfill Site ('the site') is located on Langbaurgh Ridge, just north of Great Ayton,North Yorkshire. The site is a former Whinstone quarry, which was active from the early 1800s until 1964 and include surface and below ground workings. The site was used as a landfill between 1978 and 1991, infilling the excavation left by surface quarrying to a recorded depth of around 15m. Numerous shafts, adits and below ground voids are understood to underlie the site. The site boundaries are generally very steep, formed by the former quarry walls. One of the shafts near the western end of the site has previously collapsed and been remediated. However, further collapse of the shaft (and remediation) has occurred, forming a roughly circular surface depression above the shaft location. The depression is estimated (from remote surveying) to be 10-15m wide and approximately 6-8m deep. The scheme involves the remedial work for this collapsed mine shaft. The remedial solution adopted comprises the infilling of the existing depression with lightweight aggregates contained by a geotextile 'bag' and covering with a high-strength geogrid reinforced 'soft cap'. The design has been progressed and updated in consultation with various specialist geogrid and lightweight aggregate suppliers in an attempt to deliver a constructible solution. The remedial design is focussed on providing 'betterment' to the site and does not provide a 'designed' solution; nor is the solution to be warranted by WSP or the Contractor against future failures / deviations / collapse.
Termín
10.07.2026
Zveřejněno
13.10.2026
Přiděleno
13.10.2026
Strategic Flood Risk Assessment
Přiděleno·Sep 18
Financial Accounting Solution for External Clients
Přiděleno·Sep 14
Door and Security Access System
Přiděleno·Sep 10
112-NYC-RS Waste Management Software Licenses and In Cab Technology
Přiděleno·Sep 10
Legionella Monitoring and Remedial Works
Přiděleno·Sep 3
Adobe CCS Aggregation
Přiděleno·Aug 7
UKRI-3392_02 Tunnels Structural Defects Repair Project
Přiděleno·Oct 28
CA18441 - Wet Pour Safety Surfacing - Renewal and Extension, EYFS Playground - Shaftesbury Park Primary School
Přiděleno·Oct 14
Inns Court Main Contractor
Přiděleno·Sep 29
CA18352 - Minor Works Dynamic Purchasing System 2
Přiděleno·Sep 28
Arts and Sports Bridge - Pre-Construction Works
Přiděleno·Sep 23
E20017 - Nags Heag Hill - Air Balloon Road Drainage Correction Work
Přiděleno·Aug 28
Debtor Tracing Services
Přiděleno·Oct 28
QOC971 2026-10-28 (0900) Lowestoft - Bure Park Specialist Academy, Great Yarmouth (4 seats, Individual Transport) - AWARD
Přiděleno·Oct 28
ASB505 0900 2026-10-28 Bury St Edmunds-The Junction, Stowmarket (4-seater vehicle) required. - AWARD
Přiděleno·Oct 28
CSP26893 - Administrator
Přiděleno·Oct 28
Portering Task Management System
Přiděleno·Oct 28
ITEP1261 - I&P Cloud DevSecOps Engineering & FINOPS team
Přiděleno·Oct 28
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.