Quarry Road substation detailed design. The substation development will include a 33 kV switchboard, one 33/11 kV 5 MVA transformer and an 11 kV switchboard. The site will be designed to accommodate a second supply transformer. The design for this substation was substantially completed, and the project was put on hold. The bulk of the civil and structural design, as well as the primary design, is expected to be used as far as practicable. Tenderers should be aware that PowerNet’s secondary and protection design requirements have undergone significant changes since the previous design was completed. The substation design includes the following: • Bus the Halfway Bus-Palmerston 1 and 2 feeders at Quarry Road • One 33 kV/11 kV, 3.5/5 MVA ONAN/ONAF, OLTC transformer • Relocation of the ripple control from TPT Palmerston 110/33 • 33 kV and 11 kV points of connection for the mobile substation • Substation civil works, including site grading, fencing and earth grid • Communications mast • New switch room • New 11 kV Feeder cabling • Protection System • Scada System • Safety in Design Reviews • Procurement Assistance • Construction Package
Termín
28.10.2025
Zveřejněno
12.11.2025
Přiděleno
12.11.2025
Registration of Interest (ROI) - PowerNet Distribution Network Services - Lakeland Network
Uzavřeno·Aug 4
RFT - 220kV EDN GXP and 100kV Line Build Project | CIVILS
Přiděleno·May 29
Construction and Installation Services for Kelso and Waikaka Transformer Replacements.
Přiděleno·Dec 8
Main Contractor for the new PowerNet Frankton Depot
Přiděleno·Dec 3
Advance Notice - RFT SPF Package 10A - Electrical Integration Contractor
Otevřeno k podání nabídek·Sep 29
Registration of Interest (ROI) - PowerNet Distribution Network Services - Lakeland Network
Uzavřeno·Aug 4
RFP - Watercare Electricity Supply
Uzavřeno·Jul 20
P2026-777 2026 Street Light and Traffic Signal Management Contract
Přiděleno·May 6
Request for Proposal (RFP) Electricity Supply
Přiděleno·Apr 20
Health NZ Te Toka Tumai Auckland - Greenlane Clinical Centre Electrical HV Works - 2 x Prefabricated Substation Switchrooms
Přiděleno·Oct 5
PNCC - Waste Water Treatment Plant Seismic Strengthening
Otevřeno k podání nabídek·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Otevřeno k podání nabídek·Oct 29
Herschell Street Carpark Redevelopment
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Otevřeno k podání nabídek·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.