The provision of Quantitative Risk Analysis Support for the duration of the Arena Infrastructure Project (2026-2028). Call Off Contract from the West of England Combined Authority (WECA) NEC4 Professional Services Framework 2 (PSF2). The service is being commissioned to provide a quantitative risk report on a quarterly basis to help establish costs and risk to the project.
Termín
05.03.2026
Zveřejněno
16.07.2026
Přiděleno
16.07.2026
Oaktree Av. & Finch Subways Structural Assessments
Přiděleno·Sep 30
West & North Street Railway Bridge Structural Assessments
Přiděleno·Sep 30
Bus Shelters A432 - Additional Bus Shelters on A432 Scheme
Přiděleno·Aug 13
Bus Shelters A38 - Additional Bus Shelters on A38 Scheme
Přiděleno·Aug 13
Reablement Service
Přiděleno·Aug 11
Highway Design Engineer - Consultancy Engineer Support
Přiděleno·Aug 6
Asbestos surveying and consultancy
Přiděleno·Oct 27
CBC-1917-Q-SM Water Risk Assessments - AWARD
Přiděleno·Jun 23
Fire Risk Assessments, Kingston Upon Hull
Přiděleno·Nov 25
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.