"The Opotiki CBD toilet block is in need of refurbishment as its internal fitting, fixtures, and finish are in a deteriorated state. The aim is to extend their practical life until a full rebuild is planned in approximately 5-6 years. Additionally, refurbishment of the toilets at Waiotahi Beach Surf Club is planned within the 2025 – 2026 financial year. Refurbishment of these facilities is important not only to maintain their functionality, but also to improve the amenity value in the area for residents, visitors and businesses in Opotiki District. What We Need The work for this contract is planned to be undertaken in two Separable Portions. Separable Portion 1 - Refurbishment of the Opotiki CBD toilets will include stripping out existing Fixtures; Floor treatment; repainting and relining of all interior surfaces; construction to extend cleaners’ room; conversion of parents room into disabled accessible; and replacement of robust and vandal-resistant plumbing fixtures (pans, basins, taps, hand driers, mirrors, hand-rails, etc) and lighting. Replacement of internal furniture, doors, and dividers, shelving and benching, with some internal wall construction is required. Some electrical and signage work will also be needed, together with incorporation of 2-fish design into design elements (e.g. flooring coatings and/ or glass etching, etc.) Glass - glass refurbishment/ de-scaling/ potentially with etching of the foyer glass. Separable Portion 2 Refurbishment of the toilet block adjacent to the Waiotahe Surf Club. Subject to good performance of the successful contractor for the works involved in Separable Portion 1, and acceptable pricing for Separable Portion 2, the contract will be extended to include Separable Portion 2. Works required for Separable Portion 2 have not yet been scoped in detail. A condition assessment and works scope is planned to take place late in 2025"
Termín
07.10.2025
Zveřejněno
03.02.2026
Přiděleno
03.02.2026
ODC Cont 277 -Security and Noise / Anima Control Services
Otevřeno k podání nabídek·Oct 27
ODC Contract 288: Waiotahe Bluffs Detour Improvements Localised Widening Works 2026
Otevřeno k podání nabídek·Oct 18
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
Uzavřeno·Sep 17
ODC Cont 279
Uzavřeno·Aug 7
ODC Contract 286: Ōpōtiki Netball Court Upgrade 2026
Uzavřeno·Aug 3
Advance Notice - Ōpōtiki Netball Courts Upgrade 2026
Uzavřeno·Jul 13
CON640/822: Maraetai Road Stormwater Improvements
Otevřeno k podání nabídek·Oct 21
Tayler Street Wastewater Pipe Renewal (Eltham)
Uzavřeno·Sep 6
Ardwick Street Wastewater Renewal
Uzavřeno·Aug 21
Contract 920 Waste and Water Main Renewals, Clyde St (SH1), Balclutha
Uzavřeno·Aug 13
Erewhon Rural Water Scheme Pipe Renewals 2026-29
Uzavřeno·Aug 3
Hunter Street Water Supply Pipe Renewal
Uzavřeno·Jul 27
Main Contractor for Block E (Music Suite) Roof & Wall Recladding at Maruawai College
Otevřeno k podání nabídek·Nov 1
Main Contractor for Roofing Refurbishment at Avalon School (Wellington)
Otevřeno k podání nabídek·Nov 1
Notice of Information - Napier City Council Tender Dates Over Holiday Season
Otevřeno k podání nabídek·Nov 1
Howick Fire Station
Otevřeno k podání nabídek·Nov 1
SCI_2600812 High Stage Rating Curve Modelling
Otevřeno k podání nabídek·Nov 1
Kelburn Viaduct Safety Screens
Otevřeno k podání nabídek·Nov 1
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.