Through tender notice no. 2018/S 120-274572 dated June 22, 2018, published on June 26, 2018, DSB (Danish State Railways) tendered out agreements for the procurement of 'New Trains – Supply and Maintenance of Electronic Trainsets', at an estimated value of 50 billion Danish Kroner. The tender was carried out in accordance with the Utilities Directive (2014/25/EU). DSB announces with this notice that DSB has entered into an agreement to amend the contract, cf. further details on this in sections 2.1 and 5.1. DSB has submitted voluntary ex-ante transparency notice no. 731310-2023 concerning the amendments to the contract. During the project execution the parties have disagreed about the responsibility for delay of Milestones in the Project Time Schedule and MPM Time Schedule and about certain issues regarding the Reliability regime of the agreements. Furthermore the parties have disagreed regarding a number of raised claims, Variations and Issues. The parties have agreed to settle these matters without changing the economic balance of the agreements in favour of Alstom Transport Danmark A/S ("the supplier") in a manner which was not provided for in the agreements and while maintaining the overall balance of the respective rights and obligations of the parties. The parties have therefore agreed to the following amendments: 1. Changes to the Reliability Regime in terms of a) exclusion of Significant Defects on four specific STM-DK components (however, capped), b) adjustment of parts of the stepwise improvements during Reliability Demonstration Phase, c) change of requirements for Trial Operation Test for the first five trainsets so more than five trainsets (up to seven trainsets) can be used for the Trial Operation Test in Denmark, the number of Defects allowed are reset for the Trial Operation Test in Denmark and modifications will be allowed during the Trial Operation Test outside Denmark under certain conditions, d) increase of the Reliability Target for Significant Defects and decrease of the Reliability Target for Major Defects and e) introduction of an additonal Reliability Performance Penalty. 2. Change concerning time of delivery. The date of the Preliminary Take Over (PTO) of the first trainset has been postponed by 19 months and an additional penalty for delay has been introduced. 3. Monetary compensation converted into trainsets. DSB will receive a number of trainsets at no cost and will have the possibility to receive an additional number of trainsets at no cost, if DSB submits an Additional Purchase Order for additional trainsets within a certain time frame. A new bonus regime has also been implemented in form of a “win back” mechanism, whereby the supplier can “win back” payment for some of the additional trainsets. 4. Settlement of a number of other disagreements regarding raised claims, Variations and Issues.
Zveřejněno
14.12.2023
Přiděleno
14.12.2023
Design, Build, Maintenance and Operation of the Supporting Systems (SuSy) including Equipment for S-Network (Future S-trains)
Přiděleno·Oct 29
Lease of locomotives
Přiděleno·Oct 27
Betalingsterminaler til DSB's billetautomater
Přiděleno·Oct 23
S-train Spare Parts and Maintenance agreement
Přiděleno·Oct 22
EU-Udbud faste vagter og tryghedsvagter
Přiděleno·Oct 15
EU-udbud Rengøringsmaskiner med serviceaftaler (1)
Přiděleno·Oct 15
Lease of locomotives
Přiděleno·Oct 27
Lease of locomotives
Uzavřeno·Jun 10
Supply and Maintenance of automated S-trains - (New automated S-trains)
Přiděleno·Mar 5
Levering af enhedshjul til LINT 41 byggeserie 1, 2 og 3
Uzavřeno·Jun 27
Tender for Rolling Stock
Přiděleno·Oct 11
Tender for Rolling Stock
Uzavřeno·Nov 6
Skadeservice 2026
Přiděleno·Nov 2
Brøndsugning
Otevřeno k podání nabídek·Nov 2
Udbud af medarbejderordning til Region Nordjylland
Otevřeno k podání nabídek·Nov 2
Udbud af visiteret kørsel
Otevřeno k podání nabídek·Nov 2
Udbud af rammeaftale om landinspektørydelser
Otevřeno k podání nabídek·Nov 2
Høring af udbud på stomiprodukter
Plánování·Nov 2
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.