Desilting of Harrington Drain west of Wilsthorpe Road (36m) and culverts (18m) under Wilsthorpe Road to improve conveyancing. Desilting of Golden Brook at Far Croft to remove gravels upstream and downstream to improve conveyancing. Desilting of Repton Brook at Brook End (silted under and upstream of Brook End bridge), Askew Grove (silted upstream and downstream of Askew Grove bridge) and Pinfold Lane (silted upstream and downstream of Pinfold Lane bridge) to improve conveyancing. Desilting of Hemington Brook (north of Hemington Primary School) to remove silt and weeds and improve conveyancing. Desilting of Hemington Brook (off Church Lanel) to remove silt to improve conveyancing. Desilting of Lockington Brook adjacent to Main Street to improve conveyancing. Desilting at Hogshaw Brook (confluence of Hogshaw Brook and River Wye off Bakewell and Fairfield Road and northwest of Fairfield Road bridge), to remove debris build up to improve conveyancing.
Termín
05.05.2026
Zveřejněno
07.07.2026
Přiděleno
07.07.2026
Mids - AOMR lot 1 - Saxilby Reprofiling Works
Přiděleno·Oct 29
Mids - PFR Lot 2 - Wolston
Přiděleno·Oct 21
WMD - PFR Lot 2 - Welland and Nene
Přiděleno·Oct 13
Mids - CDF Lot 2 - River Slea Ground Investigations and ESE (OBC-FBC)
Přiděleno·Oct 9
CDF - Mids - Helpston Remediation ECC
Přiděleno·Aug 3
Blaydon Quarry Landfill Gas Monitoring
Přiděleno·Jul 29
Egremont SuDS - Highway Works
Přiděleno·Oct 22
YNE AOMR Lot 1 Asset Recon AMCO Package J - Stamford Bridge
Přiděleno·Oct 20
YNE AOMR Lot 1 Asset Recon JN Bentley Package J6 - Goosepool
Přiděleno·Oct 16
YNE AOMR Lot 1 Asset Recon AMCO Package H - Castle Hill and Bransholme
Přiděleno·Oct 9
YNE AOMR Lot 1 Asset Recon AMCO Package G - Brough and Swinemoor
Přiděleno·Oct 9
YNE AOMR Lot 1 Asset Recon CHC - Winter Readiness
Přiděleno·Oct 9
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.