The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: The supply and manufacture of precast concrete SBB units & bridge cill units
Zveřejněno
13.07.2026
Otevřeno k podání nabídek
13.07.2026
Termín
20.07.2026
Manchester International Airport Phase 2 - Overbridge Civils
Uzavřeno·Oct 23
Manchester International Airport - Rail Footprint Civils
Uzavřeno·Oct 15
Manchester International Airport - Shotcrete works
Uzavřeno·Oct 6
Manchester International Airport - OLE Phase 3 Works
Uzavřeno·Sep 30
Manchester International Airport - Demolition Works
Uzavřeno·Aug 27
Manchester International Airport - Permanent Way Works
Uzavřeno·Aug 19
EAN - AOMR - Gipping Slab Replacement
Přiděleno·Aug 18
ST0581 Broughton Astley Deck Replacement Scheme - Manufacture of Precast Concrete Deck Slab Units
Přiděleno·May 19
ST0581 Broughton Astley Deck Replacement Scheme - Manufacture of Precast Concrete Deck Slab Units
Přiděleno·May 19
Supply Chain Notice: WC1857628 - B, C & D Antennas - Concrete Bases Repairs, Akrotriri (CYPRUS)
Uzavřeno·Dec 17
Supply Chain Notice: WC1858011 - Salt Lake Site (West & East) - Remedial Works Following Condition Survey of the Feeder Line Supports (Phase 1 - CIDP26) (CYPRUS)
Uzavřeno·Dec 17
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Přiděleno·Oct 31
March 2027 Bus Contracts
Přiděleno·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Přiděleno·Oct 30
Provision of Pre-Paid Cards
Přiděleno·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Přiděleno·Oct 30
Business Travel Services
Přiděleno·Oct 30
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.