The M6 Lune Gorge Structures Scheme requires Structural Monitoring across 6nr bridges, as well as CR monitoring to temporary piling on the scheme. The package will be split into 3 parts; Monitoring of the existing bridge substructures during demolition and replacement deck installation, monitoring of new construction considering settlement / tilt and vibration monitoring through construction and into post construction, and central reserve temporary embedded retaining walls works associated with piling / retaining wall construction. Tenderers will be required to propose an efficient manual / automated monitoring methodology meeting the stated frequencies, data capture, and reporting aligned with trigger and mitigation actions. Considerations around access and sequencing will be discussed. The package includes, but is not limited to: control points, baselining, routine monitoring (Ranging from daily to weekly), and maintenance.
Zveřejněno
21.04.2026
Aktīvs
21.04.2026
Termín
04.05.2026
A66 Northern Trans Pennine Project(NTP) - Carleton Underpass Structure (Precast Concrete Beams)
Otevřeno k podání nabídek·Oct 15
A66 Northern Trans Pennine Project(NTP) - Schemes 1, 2 Traffic Signals Package
Uzavřeno·Oct 5
A66 Northern Trans-Pennine (NTP) - Warcop MoD Pre-Construction ECI, Temp Works & Flood Modelling
Uzavřeno·Sep 23
A66 Northern Trans-Pennine Project (NTP) - Scheme 1 & 2 Pavement Construction
Uzavřeno·Sep 15
M6 Lune Gorge - Steel road bridge plates - Fabrication and Installation
Uzavřeno·Sep 10
M6 Lune Gorge - Roundthwaite Structure Precast Concrete Units
Uzavřeno·Sep 9
CWF Lot 2A - Town End (Orton) Bridge
Přiděleno·Oct 6
M6 Lune Gorge Structures - Monitoring Services
Uzavřeno·Apr 21
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.