The delivery of a full end-to-end service with regards to electric vehicle charging infrastructure, including; supply, installation (including groundworks), operation, maintenance, consultancy/feasibility, software, back office solutions, customer support and investment.
Termín
04.09.2023
Zveřejněno
21.01.2026
Awarded
21.01.2026
CPU 8508 Housing Services - Lithium Battery Storage and Charging Units
Přiděleno·Oct 7
Supply of DSP 27 Battery Carrier Spare Parts
Uzavřeno·Oct 7
Procurement of 3 Electric Vehicles and Charging Points via Framework TPPLHCCOP03 Lot 1 and Lot 8
Přiděleno·Aug 21
Supply and Installation of Electric Vehicle Charging Points
Přiděleno·Mar 18
Supply and Installation of Electric Vehicle Charging Points
Přiděleno·Mar 18
Local EV Infrastructure (LEVI) Pilot Scheme
Přiděleno·Jan 21
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.