Kier Infrastructure is seeking to establish a dedicated supply chain to deliver a programme of surveys in support of the design development and Environmental Impact Assessment (EIA) requirements for one of our contracts. the scope for the Water Environment surveys will include but not limited to: - Groundwater feature surveys - GWDTE, springs, sinks and abstractions - Surface water reconnaissance surveys - HEWRAT surveys - Flood risk surveys - Fluvial geomorphology Note there is no additional scope information at this time.
Zveřejněno
26.05.2026
Aktīvs
26.05.2026
Termín
02.06.2026
Kier Infrastructure - UXO Site Surveys
Uzavřeno·Sep 28
Kier Infrastructure - Engineering Bridge Structural Survey
Uzavřeno·Sep 16
Kier Infrastructure - Cultural Heritage Surveys
Uzavřeno·May 26
Kier Infrastructure - Agriculture, Forestry and Soils Surveys
Uzavřeno·May 26
Kier Infrastructure - Sound, Noise and Vibration Surveys
Uzavřeno·May 26
Kier Infrastructure - Air Quality Surveys
Uzavřeno·May 26
Bat Surveys and Licencing 2026
Přiděleno·Jun 9
Kier Infrastructure - Cultural Heritage Surveys
Uzavřeno·May 26
Kier Infrastructure - Agriculture, Forestry and Soils Surveys
Uzavřeno·May 26
Kier Infrastructure - Sound, Noise and Vibration Surveys
Uzavřeno·May 26
Kier Infrastructure - Cultural Heritage Surveys
Uzavřeno·May 26
Kier Infrastructure - Sound, Noise and Vibration Surveys
Uzavřeno·May 26
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.