Loading Otnox...
Otnox
NZNový Zéland·Nákupčí: Western Bay of Plenty District Council

Katikati Wastewater Outfall Harbour Section Replacement – Early Contractor Involvement

Uzavřeno·2 Sep 2026

The overall scope of works for this project is for the construction of a new wastewater pipeline from Katikati Wastewater Treatment Plant across Tauranga Harbour and Matakana Island and including a new marine outfall typically 1150m long. The scope of works for this contract is to provide ECI pre-construction design/methodology inputs to the consenting and design phase for renewal of cross harbour and island sections, as well as concept design inputs for the marine outfall section (not being consented at this stage). ROI Respondents will be shortlisted to two, such that an appropriate mix of construction methods and skills and experience will be represented. Respondents can offer a single method or multiple methods based on their skills and experience. Please refer to the attached ROI for further details. Please raise all questions via GETS.

Zveřejněno

02.09.2026

Otevřeno k podání nabídek

02.09.2026

Termín

25.09.2026

Otnox

Najděte zakázky, do kterých se vyplatí zapojit.

Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.

  • Zadávací dokumentaceProhlížejte dostupné soubory v jednom pracovním prostoru.
  • Požadavky a rizikaObjednejte si analýzu dokumentů s odkazy na zdroje.
  • Váš výběr zakázekPokračujte s vybranými trhy a obory.