Direct award under the NHS Commercial Solutions Framework for Modular & Pre‐Fabricated Building Solutions and Associated Services (Agreement Reference: 5514‐5512). The requirement covers the design, manufacture, supply, delivery, installation, commissioning and handover of several temporary modular school buildings ("modular learning village"), together with all associated works necessary to provide fully operational teaching accommodation at St Peter's Church of England Junior School, Ruddington, Nottinghamshire. The temporary accommodation is required following the emergency closure of the existing school buildings due to unforeseen structural issues. The modular buildings are to be suitable for occupation as an educational facility and must comply with all relevant statutory requirements, regulations, guidance and standards applicable at the time of design and installation. Scope of Services The Supplier is to provide a full turnkey solution, including but not limited to: - Full design development and coordination - Manufacture of modular units - Transportation and delivery to site - Installation, erection and assembly on site - All associated groundworks, foundations and substructures - Connection to all incoming and outgoing services - Internal fit‐out and finishes (excluding Fixtures, Furniture & Equipment, which will be provided by others) - Provision of the modular units on a hire‐only basis, including delivery and removal at the end of the service period - External works necessary for access, egress and statutory compliance - Testing, commissioning and certification - Handover documentation and post‐completion support The contract will be in place for a period of 2 years, with the option to extend for a further 6 months, dependant on the new school construction. Justification for Direct Award: St Peter's School was closed at short notice following the discovery of significant structural concerns within the existing buildings. Pupils were temporarily relocated to other schools, placing additional pressure on local education provision. A rapid solution was therefore required to enable pupils to return to their own school site as soon as possible. Due to the urgen nature of the requirement, Premier Modular and two other suppliers were contacted regarding availability and indicative costs. Premier Modular confirmed that suitable modular units were available (subject to refurbishment and final design) and that installation could be achieved within the required programme. Their costs were competitive (subject to detailed design review and site surveys). Given the urgent nature of the requirement and the need to restore on‐site education provision without delay, a direct award was made. Additional information: This is a contract award notice required under the Public Contract Regulations 2015 for the emergency requirement.
Termín
08.01.2026
Zveřejněno
17.03.2026
Awarded
17.03.2026
GB-Nottingham: AP26050 - Painting and Decorating Contract
Uzavřeno·Jul 16
GB-Nottingham: AP26009 - Asset and Building Reinstatement Valuations 2026-31
Přiděleno·Apr 23
GB-Nottingham: AP26009 - Asset and Building Reinstatement Valuations 2026-31
Přiděleno·Apr 23
GB-Notitngham: AP25171 - Scaffolding Framework
Uzavřeno·Apr 22
GB-Notitngham: AP25171 - Scaffolding Framework
Uzavřeno·Apr 22
GB-Nottingham: AP25142 - Modular Hire - St Peters School
Přiděleno·Mar 17
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.