This requirement is a call-off contract using the UK Leisure Framework https://leisureframework.co.uk/ which is a specialist procurement framework supporting leisure centre building. The contract concerns the next stage as part of the Carlton Active project with a focus on preparatory, enabling and investigatory works required to prepare the property (Richard Herrod Site) for subsequent redevelopment
Termín
26.05.2026
Zveřejněno
19.08.2026
Přiděleno
19.08.2026
Carlton Active Demolition Contract (Richard Herrod Centre)
Přiděleno·Sep 21
Contract for the provision of media and digital communication platform
Přiděleno·Aug 28
Refuse collection vehicles up to 44t
Přiděleno·Aug 28
Cloud Legal Case Management and Time Recording software and associated services
Přiděleno·Jul 30
Electoral Services Printing and Online Associated Services
Přiděleno·Jul 13
Pre-construction design services Front Street Arnold
Přiděleno·Jul 9
DNWP0037/LOT1B/ END STATES In Ground Mitigation / Tranche 4b remaining works
Přiděleno·Oct 15
Mids - CDF Lot 2 - River Slea Ground Investigations and ESE (OBC-FBC)
Přiděleno·Oct 9
Winfrith Pit 3 APC Soil Remediation Project
Přiděleno·Oct 8
M18 Greenland Lane Deck Structure Replacement - Ground Investigation
Přiděleno·Sep 29
GB-Sheffield: 5173.EFM.SW Runway Park Ground Investigations
Uzavřeno·Sep 10
M62 Heathfield Landslip - Ground Investigation
Přiděleno·Sep 9
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.