Loading Otnox...
Otnox
NZNový Zéland·Nákupčí: Ministry of Education - School Infrastructure

Blocks 1-5,9,12,13 Heating to Classrooms and Administration at Milson School

Uzavřeno·14 Sep 2026

Upgrades are required with respect of a number of Heat pumps requiring replacement in various areas around the school. The outcomes of undertaking the Heating to Classrooms and Administration Block project is primarily driven by replacement of assets at the end of life and will provide ongoing confidence to teaching and administrative buildings by maintaining environments with reduced maintenance outgoings, and equipment failures over the coming years. As works will affect ability for environmental control within both education and administrative spaces, it is proposed to undertake works during the summer holidays where minimal disturbance to students and staff can be expected. There are also some units to be relocated associated with the roofing project, so undertaking these at the same time will offer efficiencies. As there is some overlap between the Roof Remedial and Replacement Project and the Heating to Classrooms and Admin Project, priority of weathertightness being a key driver will necessitate the successful mechanical contractor to coordinate with the successful roofing contractor to deliver positive outcomes for the school, and to preserve warranties associated with the roof work project.

Zveřejněno

14.09.2026

Otevřeno k podání nabídek

14.09.2026

Termín

12.10.2026

Otnox

Najděte zakázky, do kterých se vyplatí zapojit.

Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.

  • Zadávací dokumentaceProhlížejte dostupné soubory v jednom pracovním prostoru.
  • Požadavky a rizikaObjednejte si analýzu dokumentů s odkazy na zdroje.
  • Váš výběr zakázekPokračujte s vybranými trhy a obory.