High level summary of the project includes: Undertaken roof repair as there are leaks throughout. Installation of roof insulation and suspended ceiling. Upgrade of all glazing and doors (including fire doors). Strip out of existing M&E services/plant. Installation of VRV/VRF system and ASHP. Upgrade of all lighting and ensuring complete electrical installation is ATEX/DSEAR compliant. Note, a Stage 3 design and report will be provided and we would expect a stage 4 design/report before we progress with the build stage.
Zveřejněno
18.08.2026
Otevřeno k podání nabídek
18.08.2026
Termín
15.09.2026
Modular Building Construction
Uzavřeno·Jun 24
ATEX Remedials
Uzavřeno·Jun 22
Cable Management System
Uzavřeno·Jun 17
Rotary Frequency Converter
Uzavřeno·Jun 8
Building Rewire Projects
Uzavřeno·Jun 8
60Hz Transformer Purchase
Uzavřeno·Jun 4
PR822021 - Domestic Gas Servicing and Installation
Přiděleno·Oct 19
BaDC-1582 Gas, Oil, Solid Fuel Servicing & Repairs
Přiděleno·Oct 14
Fusion21 - Design, Installation, Servicing, Maintenance and Testing of domestic heating systems.
Přiděleno·Oct 7
Commercial Heating - Short Term
Přiděleno·Oct 6
Heating Servicing, Repairs & Maintenance
Přiděleno·Sep 16
CA17043 - Phase 4 Public Sector Decarbonisation Scheme
Přiděleno·Sep 8
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.