Design, supply and installation of flooring and tiling systems including resin floors, ceramic tiling, screeds, paving, floor hatches, thresholds and associated finishes, incorporating all testing, certification, waterproofing interfaces and associated ancillary works across the MWCC North Portal Buildings.
Zveřejněno
09.10.2026
Otevřeno k podání nabídek
09.10.2026
Termín
19.10.2026
BBV HS2 MWCC NORTH - Fire Engineer Services
Uzavřeno·Oct 8
BBV HS2 MWCC NORTH - Soil Scientists Secondments
Uzavřeno·Mar 24
BBV HS2 MWCC NORTH - Soil Scientists Secondments
Uzavřeno·Mar 24
BBV HS2 MWC North Rayleigh Waves
Uzavřeno·Mar 13
BBV HS2 MWCC NORTH - Noise Barrier Consumables
Uzavřeno·Mar 13
BBV HS2 MWCC NORTH - Video conferencing Replacement plan
Uzavřeno·Mar 13
Specialist Works Framework - Windsor Road, Batley,
Přiděleno·Oct 13
Specialist Works Framework - Nether Hall Avenue Rawthorpe
Přiděleno·Oct 13
Specialist Works Framework - Waterloo Rise, Waterloo, HUDDERSFIELD
Přiděleno·Oct 7
PAHT-Lower Ground Floor Staff WC's. Additional/Extra Over Works.
Přiděleno·Sep 17
Specialist Works Framework - Farfield Road almondbury
Přiděleno·Sep 9
Specialist Works Framework - Leas Avenue, HOLMFIRTH,
Přiděleno·Sep 9
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.