Otnox
UKSpojené království·Nákupčí: MINING REMEDIATION AUTHORITY

Battery Energy Storage Systems (BESS)

Přiděleno·18 Mar 2026·GBP 296,929

The Mining Remediation Authority (MRA) is seeking a contractor to provide battery energy storage solutions for two of our Mine Water Treatment Schemes (MWTS) where solar PV systems are already installed. For each site, the costs for the following items was requested: • Battery Energy Storage System(s) (BESS) • Battery Energy Management System (BEMS) • Replacement of existing solar PV inverters where required to ensure compatibility with the retrofitted BESS. Additional information: We have completed a compliant procurement by mini competition through the Crown Commercial Services Demand Management and Renewal Framework (RM6314). CCS DMR Framework - Lot 2.1 - Procurement of Battery Energy Storage CCS DMR Framework Ref: DMR-45213-2025

Termín

26.01.2026

Zveřejněno

18.03.2026

Přiděleno

18.03.2026

Otnox

Najděte zakázky, do kterých se vyplatí zapojit.

Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.

  • Zadávací dokumentaceProhlížejte dostupné soubory v jednom pracovním prostoru.
  • Požadavky a rizikaObjednejte si analýzu dokumentů s odkazy na zdroje.
  • Váš výběr zakázekPokračujte s vybranými trhy a obory.