The BSI is seeking a supplier to deliver a Battery Energy Storage System (BESS) solution, including supply, installation, commissioning, and integration with the new Main Switchboard and related site electrical infrastructure. The system must support site electrification, improve energy resilience, optimise energy usage, maintain continuity of supply during outages, and enable integration with the new Main Switchboard and future infrastructure.
Zveřejněno
21.06.2026
Otevřeno k podání nabídek
21.06.2026
Termín
24.07.2026
400L and 150L Autoclaves
Otevřeno k podání nabídek·Oct 20
Confocal Microscope
Otevřeno k podání nabídek·Oct 18
Differential Scanning Calorimetry (DSC)
Otevřeno k podání nabídek·Oct 18
ERP Programme Legacy Modifications and Integration Provider
Uzavřeno·Jul 9
ERP Programme Payroll Solution & Implementation Services
Uzavřeno·Jun 26
DB2 Main Switchboard Upgrade (MSB)
Uzavřeno·Jun 22
RFP-Health NZ Northern Region Panel for Suppliers of Building Management Services (BMS) Projects and Maintenance Services
Otevřeno k podání nabídek·Oct 19
RFI Orion Procurement Tracker
Uzavřeno·Oct 8
ROI Non SF6 Circuit Breakers
Uzavřeno·Sep 3
RFT ES553201 Bewdley Street Substation Upgrade and Area LV Reinforcement
Přiděleno·Jul 1
RFT ES560984 Pilot Cable testing - Area 1 Ferrymead/Sumner
Přiděleno·Jun 30
RFT ES548606 Pole Replacement, Package 25 - FY27
Přiděleno·Jun 29
PNCC - Waste Water Treatment Plant Seismic Strengthening
Otevřeno k podání nabídek·Oct 30
Grow Manukau Health Park - Electronic Wayfinding and Pathfinding Solution
Otevřeno k podání nabídek·Oct 30
Total Mobility and wider PT Assurance
Otevřeno k podání nabídek·Oct 30
New Care Response for Taranaki Manawatū
Otevřeno k podání nabídek·Oct 30
National Parking Equipment Replacement Programme
Otevřeno k podání nabídek·Oct 30
Contract 26_08 Hastings Road Pavement Rehabilitation
Otevřeno k podání nabídek·Oct 30
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.