Barrow Multi-Modal Transport Study Study will assess the impact of jobs and economic growth in Barrow through the use of scenarios and identify potential intervention measures required to support this growth.
Termín
07.04.2026
Zveřejněno
07.07.2026
Přiděleno
07.07.2026
CWF Lot 2B - Riverside Corridor, Kendal, Active Travel
Přiděleno·Sep 18
CWF Lot 2B - Broadhead Bridge (Replacement Structure)
Přiděleno·Jul 7
Lot 1b - Up to 8 Passenger Seats with Passenger Assistant for various areas closing 23 February 2026 (F43)
Přiděleno·Jun 16
Lot 1a - Up to 8 passenger seats for various areas closing 23 February 2026 (F43)
Přiděleno·Jun 16
Lot 1b - Up to 8 Passenger Seats for Out of County area closing 2 February 2026 (F40)
Přiděleno·Jun 1
Lot 1b - Up to 8 Passenger Seats for Out of County area closing 2 February 2026 (F40)
Přiděleno·Jun 1
SW - WSX - Direct Award AOMR Lot 1 - Beaminster and Swanage Reservoir Repairs
Přiděleno·Oct 29
ITEP1261 - I&P Cloud DevSecOps Engineering & FINOPS team
Přiděleno·Oct 28
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Otevřeno k podání nabídek·Oct 23
SW - AOMR Lot 3 Wessex RMP 26-27 - Stonbury Banwell
Přiděleno·Oct 22
SW - DCIS - Direct Award AOMR Lot 1 - (IM & Rec) Programme - Cornwall Desilts
Přiděleno·Oct 22
Secondment of Waterman Aspen Staff under the MHA Framework
Přiděleno·Oct 20
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.