Loading Otnox...
Otnox
UKSpojené království·Nákupčí: National Highways Limited

Alloy Lighting Management System 26-28

Přiděleno·29 Oct 2026·GBP 503,894

Most street lighting on NH's Network is un-metered, which means that electricity supplier billing (approximately £40m per year) is based upon lighting inventory data. Estates & Facilities introduced Alloy in 2020 as a replacement to the legacy Street Lighting Database (SLD). This was to address resilience and functional concerns regarding the continued use of SLD. Alloy is used to manage and administrate changes to the company's lighting asset inventory data. For example, accurate reporting of LED lighting installation will result in lower carbon usage and reduced energy billing costs. It is also the initial data source for results from the national streetlighting survey currently ongoing, it is critical this service can continue

Termín

20.09.2026

Zveřejněno

29.10.2026

Přiděleno

29.10.2026

Otnox

Najděte zakázky, do kterých se vyplatí zapojit.

Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.

  • Zadávací dokumentaceProhlížejte dostupné soubory v jednom pracovním prostoru.
  • Požadavky a rizikaObjednejte si analýzu dokumentů s odkazy na zdroje.
  • Váš výběr zakázekPokračujte s vybranými trhy a obory.