Replacement of AHUs and BlueBox which have reached the end of their service life. This requirement was awarded through the NHSSBS framework Hard Facilities Management 2 (Hard FM), Lot 5.1: Ventilation and Air Conditioning,
Termín
16.10.2025
Zveřejněno
11.08.2026
Přiděleno
11.08.2026
Asset Condition Survey
Přiděleno·Aug 5
CoBP Fire Safety Survey
Přiděleno·Aug 5
Authorising Engineer - Water
Přiděleno·Aug 5
Passive RFID System for Medical Records
Přiděleno·Jul 10
Electronic Patient Record (EPR) system
Přiděleno·Apr 17
Electronic Patient Record (EPR) system
Přiděleno·Apr 17
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.